Why Six Sigma

Measurable ROI

Reduced Cycle Time

Fast Improvement

Improved Customer Loyalty

Time Management

About Six Sigma

Six-Sigma is a process improvement methodology based on statistical concepts for problem solving.
Six Sigma projects follow two project methodologies inspired by Deming’s Plan-Do-Check-Act Cycle. These methodologies, composed of five phases each, bear the acronyms DMAIC
DMAIC is used for projects aimed at improving an existing business process

The DMAIC project methodology has five phases:

Define the system, the voice of the customer and their requirements, and the
project goals, specifically.
Measure key aspects of the current process and collect relevant data.
Analyze the data to investigate and verify cause-and-effect relationships. Determine what the relationships are, and attempt to ensure that all factors have been considered. Seek out root cause of the defect under investigation.

Improve or optimize the current process based upon data analysis using techniques such as design of experiments and standard work to create a new, future state process. Set up pilot runs to establish process capability.
Control the future state process to ensure that any deviations from the target are corrected before they result in defects. Implement control systems such as statistical process control, production boards, visual workplaces, and continuously monitor the process.

What We Offer

As experienced certified Six Sigma black belt we deliver six-sigma green belt and yellow belt trainings and we coach six sigma projects implementation

Service scope:

  • Yellow belt 4 days Training
  • Green Belt 10 days training and certification
  • Coach and assess six sigma projects

Do You Have Any Questions Or Inquire? Need More Details ?